The daily heavy-traffic bottleneck in Ulas-Bangkal areas may last for three weeks as the Department of Public Works and Highways (DPWH) is repairing the damaged alternate bailey bridge along Bailey Road.
The project required them to rebuild a cable-stayed bridge, a Bailey bridge - which is a portable structure based on a truss design - and a water pipeline and aqueducts as well as watertight shelters.
Lisap Bridge was constructed on a higher elevation and with wider lanes designed for a safer and reliable bridge transport replaces the old Bailey Bridge.
All content on this website, including dictionary, thesaurus, literature, geography, and other reference data is for informational purposes only. This information should not be considered complete, up to date, and is not intended to be used in place of a visit, consultation, or advice of a legal, medical, or any other professional.