auxiliary boiler


Also found in: Thesaurus, Wikipedia.
ThesaurusAntonymsRelated WordsSynonymsLegend:
Noun1.auxiliary boiler - (nautical) an extra boiler (as a ship's boiler that is used while the ship is in port)
boiler, steam boiler - sealed vessel where water is converted to steam
ship - a vessel that carries passengers or freight
References in periodicals archive ?
As per drawing no th/11/3570, for auxiliary boiler, h- 601
The fuel cell system, which can be installed in the basement or utility room, consists of two units - the integrated DHW cylinder and auxiliary boiler as well as the fuel cell unit.
They responded after the automatic fire detection and suppression system was activated in the auxiliary boiler house just after 4pm.
The scope of work at the Sohar IPP includes supplying and installing two heat recovery steam generators, one steam turbine generator (270 MW) and an auxiliary boiler package.
Al-Bayroni ammonia plant upgrade in Jubail: Provision of support services for a new auxiliary boiler and reformer convection.
5 million gallons each totaling 35 million gallons of desalinated water per day, in addition to one auxiliary boiler," he added.
Under the contract, KBR will provide engineering design, procurement and installation support services for a new auxiliary boiler and a reformer convection section for the ammonia plant, which was originally built in the 1980s utilizing KBR's ammonia technology.
2) Auxiliary Boiler 3) Service Block 4) Ignition Gas Cylinder plant 5) Hydrogen, Oxygen and
3 mm, moc astm a 210 a1 part no a as per drawing no th/11/3570, for auxiliary boiler, h- 601
5 million gallons each, totalling 35 million gallons of desalinated water per day, in addition to one auxiliary boiler," Al Tayer said.
Under the new contract, KBR will provide engineering design, procurement and installation support services for a new auxiliary boiler and a reformer convection section for the ammonia plant, which was originally built in the 1980s, utilising KBR's ammonia technology.
Total quantity or scope: - Objective wants to equip its administrative building with central heating, which will contain two units, while keeping the heat and distribution of existence as an auxiliary boiler, installation and their operation;

Full browser ?