coach screw


Also found in: Thesaurus, Encyclopedia, Wikipedia.
Related to coach screw: coach bolt, lag screw

coach screw

n
(Building) a large screw with a square head used in timber work in buildings, etc
References in periodicals archive ?
Contract award: acquisition of spiral n3 (lot 1) and current coach screws to double elastic fastener (lot 2).
The market information includes the total market size for metal fasteners as well as the market size and trends for the following kinds of products: Aluminium fasteners Copper nuts, screws and bolts Copper cotter pins, cotters and other unthreaded fasteners Copper tacks, staples, nails and drawing pins Copper washers Other copper fasteners Iron and steel coach screws Other iron and steel wood screws Iron and steel screw hooks and screw rings Iron and steel self-tapping screws Iron and steel lock and spring washers Other iron and steel washers Iron and steel cotter-pins and cotters Iron and steel nuts Iron and steel rivets Iron and steel tacks, staples, nails, corrugated nails and drawing pins Other iron and steel fasteners
Coach screws - Other wood screws - Cotters and cotter-pins - Nuts - Rivets - Screw rings and screw hooks - Self-tapping screws - Spring washers and other lock washer - Other washers - Other steel and iron fasteners
Attach your wheels, bought from a DIY store or scavenged, to the end of them using nice big coach screws.
Then fix the inner joists using two countersunk coach screws through the outer frame and into the end of the inner joist.
Drill holes and assemble the sub-frame with two countersunk coach screws at each corner and two through the outer frame into the joists.
Drill holes through outer joist into the post and attach with two countersunk coach screws.
Procurement Construction Horses Without Joints By Welding Railroad Tracks in the Current Lines Between Stations Leu-Malu Mare Km 190 + 500 - Km 193 + 000 and By Replacing the Existing Self in Your Path with Sections 250M Rail Type 65 Made By Welding-Processing of Rails Based Welding Station Banu Brier Replaced Concrete Sleepers T17 - 300 Pieces, Replaced the Wooden Dowels with Dowels Plastic Concrete Sleepers T17 - 18,000 Pieces, Coach Screws B5 - 16,800 Pieces, Plates Rubber K60b - 9,600 Pieces, Screws 22 * 75 with Nut - 19,200 Units, Seals Glued Insulated T65 (12.
Procurement Construction Horses Without Joints By Welding Rails in Current Lines Between Stations Leu-Malu Mare Km 190 + 500 - Km 193 + 000 and By Replacing the Existing Rail Track with 250M Rail Sections Made By Welding Type 65 Initial Processing Rails Welding Based Station Maracine Banu, Replaced Concrete Sleepers T17 - 300 Pieces, Replaced Wooden Dowels with Plastic Plugs to Concrete Sleepers T17 - 18,000 Pieces, Coach Screws B5 - 16,800 Pieces, Rubber Tiles K60b - 9,600 Pieces, Screws and 22 * ?
Framework agreement with the subject: Supply of construction material for the track in 2 lots as follows Coach screws Coach Position 1 24 x 144 mm for wooden sleepers, step 12 mm, strength class 4.
Replaced the wooden dowels with plastic dowels on concrete sleepers T 17-48000 pieces of plastic plugs, coach screws B5 - 48,000 pieces, rubber tiles K60B - 24,000 pieces, polyethylene plates K60 - 24,000 pcs per section located between stations Mihaesti - RADOMIRESTI km 118 + 130 - km 124 + 957 thread I.
193 Special trav wooden switches (equivalent to 25,511 cubic meters) of wood normal trav - 70 pieces, screws and 22 x 75 with nut - 1536 pcs, coach screws B2 - 3072 pcs, rubber tiles K60L - 768 pieces, polyethylene plates K60 - 768 pcs per section located in St Olteni direct wire line 3 km 72 I + 500-73 + 850.