switchyard


Also found in: Wikipedia.

switch·yard

 (swĭch′yärd′)
n.
An area where railroad cars are switched and trains assembled.

switchyard

(ˈswɪtʃˌjɑːd)
n
(Railways) US and Canadian an area in a railway system where rolling stock is shunted, as in forming trains

switch•yard

(ˈswɪtʃˌyɑrd)

n.
a railroad yard in which rolling stock is distributed or made up into trains.
[1885–90, Amer.]
Translations

switchyard

[ˈswɪtʃjɑːd] N (US) (Rail) → patio m de maniobras, estación f clasificadora
References in periodicals archive ?
Tenders are invited for Providing permanant electrification for 33 kv switchyard of the tembhu lift irrigation scheme stage iv
M2 EQUITYBITES-September 26, 2017-Transelec SA acquires Don HA(c)ctor switchyard in Chile for the generation of solar energy
The company yesterday told the Philippine Stock Exchange it had resumed operations in San Lorenzo Switchyard which connects First Gen's three natural gas-fired power plants to the transmission lines of the National Grid Corporation of the Philippines.
The sources said earth work of the Switchyard had also been completed while the up-gradation of the Switchyard was scheduled to be completed in May 2017,enabling WAPDA to disperse electricity from Tarbela Hydel Power Station to the National Grid after completion of Tarbela 4th Extension Hydropower Project.
Lahore -- Pakistan Water and Power Development Authority (WAPDA) signed the contract costing to US$ 25 million with Etern - CCCE - Hei, a consortium of three Chinese Companies, for up-gradation of the existing Switchyard of Tarbela Hydel Power Station for dispersal of electricity from Tarbela Hydel Power Station after completion of the 1410 MW - Tarbela 4th Extension Hydropower Project.
The test follows the completion of the energisation of the switchyard for units one and two and the "substantial completion" of the auxiliary building at unit one.
International Resource News-June 4, 2015--Georgia Power completely redesigns 500 kilovolt switchyard for Vogtle units 1 and 2
GIS switchyard package pertaining to Southern Helwan 3 x 650 MW thermal gas/ oil power plant under funding from the Jeddah based IDB - Islamic Development Bank.
The 132 KV Switchyard pre-commissioning was completed and was commissioned in October.
American Recovery and Reinvestment Act workers recently finished demolishing structures in an electrical switchyard used to help power the Portsmouth Site's uranium enrichment processes for defense and commercial uses for nearly five decades.
For the rest Visagino paid with switchyard and own assets.
The substation steps up the voltage to the 230KV level, where a Careba Mott MacDonald designed transmission line moves the power to a switchyard seven miles away.