cumec


Also found in: Encyclopedia, Wikipedia.

cumec

(ˈkjuːmɛk)
n
(Units) the unit of volumetric rate of flow, equal to one cubic metre per second
References in periodicals archive ?
Tenders are invited for construction of head regulator for 1500 cumec discharge construction of embankment and edge protection work near belwa in district sheohar under bagmati flood management scheme phase-iv a
The project is estimated to generate 78 Mega Watt of energy with a design discharge of 9.10 cumec per second and the Net Head of about 1000 meters.
The project envisages construction of 148 M high rock-filled dam for the supply of 23 cumec water to Delhi and other basin states.
'In fact Wapda had claimed that release of nine cumec water from Nauseri was in accordance with the international standards and that another 20 cumec water from the downstream tributaries will be added to it,' he said.
The decision of the Court did not exactly accrue in any country's favour; while it allowed for the building of the Dam, it did so only with the strict conditions that India shall release a minimum flow of 9 cumec (cubic metre per second) into the Kishanganga River.
Upper bound derived from figure 6 for Azad Pattan station is 18495 cumec. Results show that log-Pearson type III distribution was unbounded and it crossed the upper bound envelope curve so it is not fit for this Azad Pattan station.
Hill torrents have contributed their flow in this reach; major contribution was from Sangar and Vehowa hill torrents that were 2166 and 3129 cumec respectively [6].
The extra water in conjunction with a 15 cumec release from Kielder Reservoir also helped the situation in the Tyne estuary, moving many fish out of danger and upstream.
Summary: Guwahati (Assam) [India], Aug 31 (ANI): Flood alert has been issued in low-lying areas nearing the Siang/ Brahmaputra river in Arunachal Pradesh and Assam after 9020 cumec of water was discharged into Tsangpo river by China on Thursday.
Lesotho had supplied to South Africa 27.5 cumec regulated water after the completion of the entire First Phase of the multipurpose Lesotho Highland Water Project (LHWP).
The final award determined that India shall release a minimum flow of 9 cumec (cubic metre per second) into the Kishanganga/Neelum River below the Kishanganga Hydroelectric Project (KHEP) at all times.
###Sr.###Reservoir###Physical Model Discharge (Cumec)###CFD Model Discharge (Cumec)###Avg.%