Operational Requirements Document


Also found in: Acronyms.

Operational Requirements Document

A formatted statement containing performance and related operational parameters for the proposed concept or system. Prepared by the user or user's representative at each milestone beginning with Milestone I, Concept Demonstration Approval of the Requirements Generation Process. Also called ORD.
References in periodicals archive ?
The JSF Operational Requirements Document (ORD) requires that the aircraft must be designed to facilitate pilot survivability and must facilitate decontamination when exposed to CB agents.
The JPEO JTRS announced in January 2011 the approval of the operational requirements document (ORD) underpinning the COALWNW specification.
"I signed the first operational requirements document for WIN-T probably around 2000," said Cuviello, who served as Fort Gordon's commanding general and Chief of Signal from 1998 to 2000 and later served as the Department of the Army Staff Chief Information Officer/G6.
Headquarters, Department of the Army, has recently approved an Operational Requirements Document for digital radiography.
Clearly, what was needed was an Operational Requirements Document that specified requirements at a high level of technology readiness and saved upgraded capabilities that involved less mature technologies for future preplanned product improvements.
The JAUS has been mandated within the OSD Joint Robotics Program and is a FCS Operational Requirements Document (ORD) requirement.
The Operational Requirements Document specifically states, "Storage, transportation and deployment will include operations in cold, basic and hot climates." In fact, despite any setbacks, the RTCH has performed remarkably well in both Operation Iraqi Freedom and Operation Enduring Freedom (both desert environments) enabling commanders to move containers rapidly throughout the theater.
Meanwhile, we worked the concepts and requirements for the future intelligence ground processing system, DCGS-A, ultimately obtaining the Army Requirements Oversight Council approval for the Operational Requirements Document (ORD) on 2 December 2003.
A C-MNS is defined as follows: A C-MNS is a single document that satisfies the mission needs statement and Operational Requirements Document in a crisis situation.
Army Test and Evaluation Command to ensure the unit and equipment meet the Army requirements outlined in the Operational Requirements Document and Test and Evaluation Master Plan.
* Approved the FCS Operational Requirements Document.

Full browser ?