peak load


Also found in: Encyclopedia, Wikipedia.

peak load

n
(Electrical Engineering) the maximum load on an electrical power-supply system. Compare base load
Collins English Dictionary – Complete and Unabridged, 12th Edition 2014 © HarperCollins Publishers 1991, 1994, 1998, 2000, 2003, 2006, 2007, 2009, 2011, 2014
Mentioned in ?
References in periodicals archive ?
The campaign urges residents to refrain from using appliances that consume a lot of energy from peak load hours of 12pm to 6pm.
The 5G energy joint innovation test was conducted on multiple topics, such as insufficient mains capacity in special scenarios, peak load shaving, and intelligent battery management and accurate configuration.
Rated for continuous operation at 120W and 240W, the DRBs can deliver a +20% peak load for up to 10 seconds.
Nevertheless, a significant creep effect at the peak load may influence the subsequent unloading behavior, causing the contact stiffness to be overestimated, especially for viscoelastic materials [5].
The highest peak load demand of 10,876 megawatts was recorded for the Luzon grid, breaching this year's peak demand forecast of 10,561 MW set by the Department of Energy's Power Development Plan.
NGCP said the Luzon grid reached its highest peak load demand of 10,876 megawatts (MW) last May 28, breaching this year's peak demand forecast of 10,561 MW set by the Department of Energy (DOE) in its Power Development Plan (PDP).
Peak load on "Sahil" was usually 20,000-25,000 passengers, but it used to reach 32,000 per hour in the winter.
FRIDAY, March 9, 2018 (HealthDay News) -- Compared with intramedullary screw fixation, plantar-lateral plating allows for greater cycles to failure and peak load before failure when applied to cadaver foot specimens with simulated Jones fracture, according to a study published online Feb.
"Right now, solar energy is not considered a base load and is utilised only during peak load hours.
With the launching of this application, the taxpayer / EI will be able to prepare sales tax invoices without having to remain connected with the internet, thus the issues related to connectivity, peak load, system downtime etc.
With the launching of this application , the taxpayer/ EI will be able to prepare sales tax invoices without having to remain connected with the internet, thus the issues related to connectivity, peak load, system downtime etc.
He added: "The first customers' solar photovoltaic systems connected to DEWA's grid, under [the] Shams Dubai initiative, was [at] the rooftop of the employees' building at Dubai World Central - Al Maktoum International Airport, with a capacity of 30 kilowatts at peak load (kWp).